ACC BBD2 – Battery Gigafactory

Billy-Berclau / Douvrin

Realization of Cleanrooms and Controlled Zones

Mission:
Installation of:

  • Technical supports
  • Cable trays
  • FFU Dampers (Fan Filter Units)
  • Plenum ceilings
    • Modular walls made of HPL panels for critical production rooms

 

Realization:
Integration of advanced fluids engineering and BIM fluids for cleanroom creation in a high-tech industrial environment.

The plenum ceiling solutions and airflow management were designed for optimal energy efficiency, meeting the air cleanliness requirements of modern industrial building construction.

 

Associated Expertise:

M&E engineering and fluids engineering consultancy specialized in fluids system design for controlled environments and HVAC and fluids optimization in the advanced industry sector.